Project Challenge:
The Condominium Association understood that their 60-year old
parking garage was in extreme need of repair, but they needed
a consultant with extensive knowledge of parking structure rehabilitation
in order to complete the project.
Project Solution:
Klein and Hoffman (K&H) conducted a condition assessment
to quantify the necessary repairs and develop appropriate solutions.
After reviewing the possibility of performing isolated repairs,
K&H determined that the most cost-effective solution was
to completely remove the existing slab and replace it with
a new system.
K&H developed new concrete collars to support the replacement
floor. Prior to demolition all columns were braced to prevent
the floors above from collapsing.
K&H successfully designed and directed this project through
construction with minimal disruption to the condominium unit
owners.