Evidence of Delamination and Leeching

Evidence of Delamination and Leeching

Full Slab Demolition

Full Slab Demolition

Pouring the New Full Slab Replacement

Pouring the New Full Slab Replacement

|

The residential tower’s below grade parking garage ceiling was severely deteriorated after years of exposure to the environment. Following a thorough investigation including both material and non-destructive testing, K&H determined substantial concrete repairs were required. After careful consideration, the best solution was determined to be a full slab replacement. Great care had to be taken by the contractor during the slab removal to prevent instability in the main building columns.

Ridgeview Tower -1567 Ridge Garage Investigation and Rehabilitation

Evanston, IL

Existing Structures Structural Rehab / Adaptive Reuse

Parking Structures

Heil, Heil, Smart & Golee

Ridgeview Tower Condominium Association

Homa Ghaemi